← Back
ENGINEERING NOTES · May 2026
Three common mistakes in an ICS Gap Assessment
After years running and reviewing gap assessments in industrial environments, these three come up more than any other.
- Treating the asset inventory as a one-time exercise. In OT, inventory degrades fast — a contractor adds a device, a firmware update changes a version — and a gap assessment built on an eight-month-old inventory is already measuring a network that no longer exists.
- Copying IT controls without adapting them to OT availability. 'Immediate reboot after a critical patch' sounds fine on a checklist, but on a plant floor that can't stop without production coordination, that control is paper, not real practice.
- Measuring maturity only in technology, not process and people. A well-configured industrial firewall doesn't help much if nobody's clear on who approves a rule change, or if the incident-response procedure lives in a document nobody's read since it was signed.
The common thread across all three: a gap assessment that only looks at technology produces a nice-looking snapshot and a false sense of security. One that also looks at process, people, and its own data's expiration date produces something that actually reduces risk.